Each Putzmeister pump family ships with certification dossiers EPC bidding desks and site safety officers can drop into tender binders as issued.
"Held a 14-hour continuous core pour with one 42 m boom pump and zero rock-valve stalls — outlet pressure stayed inside the chart through the night shift."
Concept-to-commissioning support across boom pumps, trailer line pumps and Telebelt conveyors for contractors who measure uptime in cubic meters placed.
Talk to a Pump Field Engineer